(1)動(dòng)力方面。
(1) In terms of power.
撒布車配有自動(dòng)和手動(dòng)雙動(dòng)力操控平臺(tái),在施工過(guò)程中更加節(jié)能。
The spreader is equipped with an automatic and manual dual power control platform, which is more energy-efficient during the construction process.
(2)智能化方面。
(2) In terms of intelligence.
出料口配有均整器,使粉料的撒布更均勻平整。施工過(guò)程中可全自動(dòng)化操作,施工參數(shù)均可隨時(shí)顯示,且可記錄保存。
The discharge port is equipped with a homogenizer to ensure a more uniform and smooth distribution of powder. The construction process can be fully automated, and the construction parameters can be displayed at any time and recorded and saved.
(3)環(huán)境保護(hù)方面。
(3) In terms of environmental protection.
車輛配有脈沖式除塵系統(tǒng),有效地控制了揚(yáng)塵,可降低整個(gè)施工過(guò)程的空氣污染。
The vehicle is equipped with a pulse type dust removal system, which effectively controls dust and reduces air pollution throughout the construction process.
粉料撒布車適用于撒布水泥、石灰粉、粉煤灰等粉狀物料。
The powder spreading vehicle is suitable for spreading powdered materials such as cement, lime powder, and fly ash.
冷再生拌和機(jī)工作原理是配備一個(gè)裝有若干個(gè)硬質(zhì)合金刀具的切削轉(zhuǎn)子,轉(zhuǎn)子旋轉(zhuǎn)時(shí),向上切削泥土,在拌和罩內(nèi)被切削下的泥土與撒布的緩凝水泥進(jìn)行充分均勻地混合,見(jiàn)圖11。當(dāng)工作深度一旦確定時(shí),轉(zhuǎn)子的切削深度將由傳感器感應(yīng)并傳達(dá)至控制系統(tǒng),從而保證拌和深度,達(dá)到最佳拌和要求。在冷再生拌和機(jī)工作時(shí),其行進(jìn)速度為5~8m/min,同時(shí)配有專人跟機(jī)每隔15~20m檢查拌和深度,并配合再生機(jī)操作人員及時(shí)調(diào)整拌和深度,嚴(yán)禁出現(xiàn)拌和不到位的夾層現(xiàn)象。
The working principle of the cold recycling mixer is equipped with a cutting rotor equipped with several hard alloy cutting tools. When the rotor rotates, it cuts the soil upwards, and the soil cut in the mixing hood is thoroughly and evenly mixed with the dispersed retarding cement, as shown in Figure 11. Once the working depth is determined, the cutting depth of the rotor will be sensed by sensors and transmitted to the control system to ensure the mixing depth and achieve the optimal mixing requirements. When the cold recycling mixer is working, its traveling speed is 5-8m/min, and a dedicated person is assigned to follow the machine to check the mixing depth every 15-20 meters, and cooperate with the regeneration machine operator to adjust the mixing depth in a timely manner. It is strictly prohibited to have interlayer phenomena where the mixing is not in place.